โ
Description
Turctech air spring 904882-02
OEM cross-references
| Brand | Part number | |
|---|---|---|
| Vibracoustic | V1DF16-2 NP | View cross-ref |
| Gart | C289/M | View cross-ref |
| Gart | 289.0.512 | View cross-ref |
| Primeride | NEW 1R10-702 | View cross-ref |
| Primeride | NEW FLEX NO 566-20-3-502 | View cross-ref |
| EAC | NO 9048822 | View cross-ref |
| M.A.N. | TGA 81436010151 | View cross-ref |
| M.A.N. | 81.43601.0151 | View cross-ref |
| M.A.N. | 81436010176 | View cross-ref |
| M.A.N. | 81.43601.0176 | View cross-ref |
| M.A.N. | 81436016065 | View cross-ref |
| Springride | 1R10-702 | View cross-ref |
| Phoenix | 1DF16-2NP | View cross-ref |
| ContiTech | 4882 N1P01 | View cross-ref |
| ContiTech | 4982 N | View cross-ref |
| Springride | FLEX 566-20-3-502 | View cross-ref |
| Firestone | 1T17TWCR-8.0 | View cross-ref |
| Firestone | W01M588355 | View cross-ref |
| Goodyear | 566-20-3-502 | View cross-ref |
| CF | GOMMA 1TS260-32 | View cross-ref |
| CF | GOMMA 207760 | View cross-ref |
| Dunlop | FR D10U01 | View cross-ref |
| Airtech | 34882 P | View cross-ref |
| AIRSTONE | LKW4882 02 | View cross-ref |
| STEMMA | S4882 02 | View cross-ref |
| PEDRO | P4882 02 | View cross-ref |
| FEBI | 35494 | View cross-ref |
| Neotec | ABM 541 27 B | View cross-ref |
FAQ โ Turctech 904882-02
- What is Turctech 904882-02?
- Turctech air spring 904882-02
- What is the OEM cross-reference for 904882-02?
- Cross-references include: Vibracoustic V1DF16-2 NP; Gart C289/M; Gart 289.0.512; Primeride NEW 1R10-702; Primeride NEW FLEX NO 566-20-3-502; EAC NO 9048822; M.A.N. TGA 81436010151; M.A.N. 81.43601.0151; M.A.N. 81436010176; M.A.N. 81.43601.0176; M.A.N. 81436016065; Springride 1R10-702; Phoenix 1DF16-2NP; ContiTech 4882 N1P01; ContiTech 4982 N; Springride FLEX 566-20-3-502; Firestone 1T17TWCR-8.0; Firestone W01M588355; Goodyear 566-20-3-502; CF GOMMA 1TS260-32; CF GOMMA 207760; Dunlop FR D10U01; Airtech 34882 P; AIRSTONE LKW4882 02; STEMMA S4882 02; PEDRO P4882 02; FEBI 35494; Neotec ABM 541 27 B.
- What is the minimum order quantity?
- Contact the supplier for minimum order quantity.
- How long is the lead time?
- Lead time depends on quantity and current stock. Request a quotation.